IMPORTANT INFORMATION

For the study of your project, technical documents will have to be provided

 

First stage

  • A soil study

  • A surveyor's topographic plan.

 

 

These parts are mandatory and essential for the manufacture of your Villa.

They will also be used to apply for your building permit and to obtain work damage insurance.

 

Second step

See the terms of the building permit

 

Third step

  • The foundations

 

Before assembling your Villa, you will need to make foundations and a slab.

 

ARISTODOLPHIN supports you in this essential step, our design offices draw up the plan of the slab, the load drops, which will give the dimensions of the foundations and the concrete slab to be made.

 

step Four

  • Assembly of a villa

 

Foundation and slab realizes, the assembly time by professionals of a villa of 100 M2

(Out of water / Out of air) is 3 weeks.

 

ARISTODOLPHIN is not by a builder, we work in partnership with building professionals with a perfect knowledge of metal frame construction.

 

ARISTODOLPHIN can provide you with quotes from its professional partners for all the work, you can also call on local professionals to carry out your work.

 

ARISTODOLPHIN will provide you with all the detailed assembly or installation instructions for Villa and Optional packs.

 

You have the possibility of taking the technician pack for the follow-up of the assembly of the villa (out of water / out of air).

 

 