OUR OPTIONAL PACKS

ARITODOLPHIN through partners offers optional PACKS

 

BUILDING PERMIT PACK

• Preliminary studies.

 

• Summary and final draft.

 

• Building permit application file.

​

(The price of the option is defined according to the built area)

PACK office thermal study

(in addition to the building permit pack only)

To build whether you are an individual or a professional, a private or public partner.

 

The thermal study is a mandatory formality and must comply with the RT (thermal regulations) 2020.

 

(The price of the option is defined according to the built area)

PACK damage insurance

What is work damage insurance or guarantee?

 

  • Its purpose is to guarantee the reimbursement or repair of disorders covered by the ten-year guarantee without waiting for court decisions.

 

  • The company providing this guarantee must have the necessary work determined by a single expert.

 

  • It is up to her to turn against the person (s) responsible for the disorders found.

 

  • The starting point of the guarantee begins at the end of the first year following the reception of the works, it thus takes the continuation of the guarantee of perfect completion and ends at the end of the ten-year guarantee.

 

  • It guarantees the owner who had the work done, but also the following owners within the limit of the duration of the ten-year warranty.

 

  • This insurance has a mandatory nature, its non-subscription can cause difficulties in obtaining a bank loan and in the event of resale of the property during the ten-year guarantee period.

​

(The price of the option is defined according to the built area)

Electricity / VMC PACK

Ready-to-install electrical pack is pre-wired and the ducts are the lengths suited to your site.
Very easy to install, your electric octopus is supplied with instructions and your laying plan.

 

(The price of the option is defined according to the built area)

Plumbing / water heater PACK

Ready-to-install plumbing packs are seamless and have no specific tools.
Very simple to install, it is supplied with instructions and your installation plan.

 

(The price of the option is defined according to the built area)

Photovoltaic self-consumption PACK

The legislation allows you to carry out your installation yourself.

With the self-consumption solar pack you can produce part of the energy you consume.
To simplify assembly, the solar system for self-consumption is delivered with the entire
Necessary material.

The mounting of the mounting structure is intuitive, the electrical system is pre-wired at the factory and no specific tools are required.
In summary, depending on your consumption and your investment, you can be independent
between 10 and 80%.
(This pack is included in the calculation of the RT 2020)

Rainwater recovery PACK

The rainwater recovery tank is delivered with its system which allows to control
automatically the recovery water or city water supply.
When the tank is empty, the device automatically switches to city water to supply
continuously your equipment until the next rain.
The system allows the separation between running water and recovery water so that there is no
mix between the two.
Thanks to this system, you can use the recovered water to power your house (machine
washing machine, WC).
This device is as
economical as it is ecological .

PACK self-contained septic tank

If you are not connected to the main sewer the septic tank is intended for the pre-treatment of all
domestic wastewater choice is defined by the number of main rooms in the house (ex 3000
liters for 5 pieces)

 

(The price of the option is defined according to the built area)

Technician PACK
(monitoring of the assembly of the villa out of water / out of air)

What is the role of the technician?

He sets up the methodology to launch the site. He ensures the preparation of interventions,

organizes, coordinates and controls the work carried out by the various teams he leads.
He ensures compliance with environmental standards and monitors the compliance of works until their completion.
term. In the event of an anomaly, it recommends corrective solutions. He writes the site report and
monitors it and is in permanent contact with partners.
He ensures that the work carried out complies with the customers' order in terms of time,
quality and price.

 

(The price of the option is defined according to the built area)